24" x 46' 1440 PSI Amine Gas Sweetening Package

Sold

Listing Details

CategoryAmine Plant
Listing ID10081
StatusUnavailable
CertificationFuelled Certified
Year2000
Make/ManufacturerAlco Gas and Oil
ServiceSour
ConditionUsed
Fuelled Condition Rating
B
Condition A
New/Unused Equipment

Condition B
Ready to go into operation with minor service (tune-up).
Used but has been overhauled.

Condition C
Requires Overhaul but components are present and not damaged/used beyond repair.

Condition D
Requires Overhaul and major components (vessels, engine, instrumentation, piping, panel, etc.) are missing or damaged beyond repair.

Condition E
Scrap or suitable for parts. Major item(s) missing (I.e. Separator Package missing separator vessel or Compressor Package missing driver).
Amine Plant Details
PackagerAlco Gas and Oil
Notes

Description: Alco Amine Plant, looks to be in good visual condition.

Alberta registrations only.

Trim Cooler: 7.5HP
Amine Contactor: 610mm x 14093mm (9929kpa)
Sweet Gas Separator: 610mm x 1524mm
Amine Flash Drum: 610mm x 2438mm

Amine Charge Pumps: (2) x 15HP, 13.7USGM @ 6598kpa
Amine Booster Pumps: (2) x 5HP, 20.8USGPM @ 850kpa
Amine Reboiler: 930,336 btu/hr direct fired, c/w 1,250,000 btu/hr flame arrestor

Certified Report

Location
Work Site

N7 Energy - 15-10-62-6W5

Status
Equipment Still in Operation

No

Does the skid have skirting that needs to be removed

Yes

Equipment still connected to piping

Yes

Equipment still welded down to piles

N/A

Equipment on a gravel pad

N/A

Electrical still connected to the equipment

Yes

Have vessels been cleaned out

Unknown

Shiploose items

Yes

Service
Has equipment been preserved? If so, when?

Unknown

Site Logistics
Equipment accessibility in yard or work site
Access into work site
Any road use agreement to access site

Yes

Vessel Registrations
Provincial Vessel RegistrationsAB
Equipment Appearance
Missing Parts
Corrosion
Animal Infestation
Overall cleanliness of package

Need Help?


Questions? Call us at 1-855-383-5533

Log in to contact Fuelled

Virtual Tour

Location

Fort Assiniboine, Alberta

Documents

24" x 46' 1440 PSI Amine Gas Sweetening Package 1

This equipment is Fuelled Certified.

Benefits to purchasing Fuelled Certified equipment:
  • Visually inspected and catalogued by Fuelled trained representatives
  • Immersive and credible data
  • Fuelled logistical support

Other Listings In This Package