~2.2 MMSCFD Fuel Gas Conditioning System

Contact for Pricing

Listing Details

CategoryMiscItem
Listing ID14478
StatusAvailable
# of Units Available1
Deal PreferenceFor Sale
Price TypeTotal
PackageFuel Gas Conditioning System - Fort St. John
CertificationFuelled Certified
Year2019
Model2.2 MMSCFD
ServiceSweet
ConditionUsed
Fuelled Condition Rating
B
Condition A
New/Unused Equipment

Condition B
Ready to go into operation with minor service (tune-up).
Used but has been overhauled.

Condition C
Requires Overhaul but components are present and not damaged/used beyond repair.

Condition D
Requires Overhaul and major components (vessels, engine, instrumentation, piping, panel, etc.) are missing or damaged beyond repair.

Condition E
Scrap or suitable for parts. Major item(s) missing (I.e. Separator Package missing separator vessel or Compressor Package missing driver).
Notes

Description: Drawings available upon request.

FGS-04

12" x 5' Separator Tag*
W RT-2
Year: 2012
Serial: V181040
DIA: 12"
Height: 5'
MAWP: 1440 PSI at 130°F
MDMT: -20°F at 1440 PSI
Shell THK: 0.844"
Head THK: 0.650"
CRN: Y8995.2
CA: 0.125"
A#: 564630
Altered By Score Projects Jan 15/2019
Inlet Pressure: 2000kpa - 8000kpa
Outlet Pressure: 550kpa - 1200kpa

24" x 4' Separator Tag*
W RT-2
Year: 2016
Serial: V-15731
DIA: 24"
Height: 4'
MAWP: 1440 PSI at 130°F
MDMT: -20°F at 1440 PSI
Shell THK: 1.0"
Head THK: 0.9375"
CRN: V8074.213
CA: 0.125"
A#: 654388

Northern Design Vessel Tag*
MAWP: 285 PSI at 100°F
MDMT: -20°F at 285 PSI
Year: 2018
Serial: 17692
Job NO: N2222
DWG: 6FB10F
Shell: 6.625 OD X 0.280X68 9/16 S/S
Model: PF ICN 01-102917
Model: 89-1-336-6-285-2
Elemt NO: 00-032856

Fuel Gas Skid Tag*
Device Tag: UT-1000
Serial: 30709
Inlet Pressure: 6500kpa - 10000kpa

Certified Report

Location
Yard

Envirofrac - Fort St. John

Status
Equipment Still in Operation

No

Does the skid have skirting that needs to be removed

No

Equipment still connected to piping

No

Equipment still welded down to piles

No

Equipment on a gravel pad

No

Electrical still connected to the equipment

No

Have vessels been cleaned out

Unknown

Shiploose items

Yes

Service
Has equipment been preserved? If so, when?

N/A

Site Logistics
Equipment accessibility in yard or work site
Access into work site
Any road use agreement to access site

No

Vessel Registrations
Provincial Vessel RegistrationsAB, BC, SK
Equipment Appearance
Missing Parts
Corrosion
Animal Infestation
Overall cleanliness of package

Need Help?


Virtual Tour

Location

Fort St. John, British Columbia

This equipment is Fuelled Certified.

Benefits to purchasing Fuelled Certified equipment:
  • Visually inspected and catalogued by Fuelled trained representatives
  • Immersive and credible data
  • Fuelled logistical support

Other Listings In This Package

Fuel Gas Conditioning System - Fort St. John
View package

Related Listings