24" x 12' 1480 PSI Ultrafab Sweetening Package

Sold

Listing Details

CategoryGas Sweetening Equipment
Listing ID10744
StatusSold
CertificationFuelled Certified
Year2006
Make/ManufacturerUltrafab Industries Ltd.
ServiceUnknown
ConditionUsed
Fuelled Condition Rating
B
Condition A
New/Unused Equipment

Condition B
Ready to go into operation with minor service (tune-up).
Used but has been overhauled.

Condition C
Requires Overhaul but components are present and not damaged/used beyond repair.

Condition D
Requires Overhaul and major components (vessels, engine, instrumentation, piping, panel, etc.) are missing or damaged beyond repair.

Condition E
Scrap or suitable for parts. Major item(s) missing (I.e. Separator Package missing separator vessel or Compressor Package missing driver).
Vessel Details
Vessel OrientationUnknown
Pressure Rating1480 PSI
Notes

Description: 24" x 12' Sweetening Tower
16" x 5' Separator
Bruin Series Chemical Pump
24,000 BTU/HR Catalytic Heater
6.7" x 30" Fuel Gas Scrubber
Fresh Chemical Storage - 7.95m3
Spent Chemical Recovery Tank - 7.95m3
H2S Sweetening Vessel - 24" x 4'

Ultrafab sweetener (24"x12'x1480 psi)/100bbl tank Mar-07 06-506 570652 2006 new, rental unit purchased Oct.1/07

Certified Report

Location
Work Site

13-23-83-11 W6

Status
Equipment Still in Operation

No

When was equipment last run

unknown
Does the skid have skirting that needs to be removed

N/A

Equipment still connected to piping

Yes

Equipment still welded down to piles

Yes

Equipment on a gravel pad

N/A

Electrical still connected to the equipment

Yes

Have vessels been cleaned out

Unknown

Shiploose items

N/A

Service
Has equipment been preserved? If so, when?

Unknown

Site Logistics
Equipment accessibility in yard or work sitecannot access when wet
Access into work sitecannot access when wet
Any road use agreement to access site

N/A

Vessel Registrations
Provincial Vessel RegistrationsAB, BC, SK
Equipment Appearance
Missing Partscannot access when wet
Corrosioncannot access when wet
Animal Infestationcannot access when wet
Overall cleanliness of packagecannot access when wet
Notes

Yes, the last UT & visual inspection we did on that sweetening package was in July 2013 (copies attached). It has to be done every 5 years and since it was suspended back in Jan/2016 after another 2.5 years of service, we have not done another one.

Need Help?


Questions? Call us at 1-855-383-5533

Log in to contact Fuelled

Virtual Tour

Location

Worsley, Alberta

Documents

24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1
24" x 12' 1480 PSI Ultrafab Sweetening Package 1

This equipment is Fuelled Certified.

Benefits to purchasing Fuelled Certified equipment:
  • Visually inspected and catalogued by Fuelled trained representatives
  • Immersive and credible data
  • Fuelled logistical support

Related Listings