12' x 28' MCC/ Office Building

Contact for Pricing

Sold

Listing Details

CategoryMotorControlCenter
Listing ID10868
StatusSold
CertificationFuelled Certified
ConditionUsed
Fuelled Condition Rating
B
Condition A
New/Unused Equipment

Condition B
Ready to go into operation with minor service (tune-up).
Used but has been overhauled.

Condition C
Requires Overhaul but components are present and not damaged/used beyond repair.

Condition D
Requires Overhaul and major components (vessels, engine, instrumentation, piping, panel, etc.) are missing or damaged beyond repair.

Condition E
Scrap or suitable for parts. Major item(s) missing (I.e. Separator Package missing separator vessel or Compressor Package missing driver).
Notes

Description: Unit is a combo MCC and Control Room

Contactor Panel
Syntech CP-101A

Control Panel
Allen- Bradley SMC K305

MCC Interface Panel:
Guild Associates Inc
P/N: CSRI-32910
Voltage: 480 VAC
Current: 89 AMPS
Frequency: 60 Hz
Phase: 3

Syntech PLC Control Panel
Model: SPR 000575- PLC-PNL
Serial No.: 000575-PLC-PNL
Voltage: 120 VAC
Frequency: 60 Hz
Amperage: 15 A

Certified Report

Location
Work Site

CSRI Gas Plant C-093-H/094-B-1

Status
Equipment Still in Operation

No

Does the skid have skirting that needs to be removed

No

Equipment still connected to piping

Yes

Equipment still welded down to piles

No

Equipment on a gravel pad

No

Electrical still connected to the equipment

Unknown

Have vessels been cleaned out

N/A

Shiploose items

Yes

Boxes and shelving/storage on the inside
Service
Has equipment been preserved? If so, when?

N/A

Site Logistics
Equipment accessibility in yard or work site
Access into work site
Any road use agreement to access site

N/A

Equipment Appearance
Missing Parts
Corrosion
Animal Infestation
Overall cleanliness of package

Need Help?


Questions? Call us at 1-855-383-5533

Log in to contact Fuelled

Virtual Tour

Location

Hudson's Hope, British Columbia

Documents

12' x 28' MCC/ Office Building 1
12' x 28' MCC/ Office Building 1
12' x 28' MCC/ Office Building 1

This equipment is Fuelled Certified.

Benefits to purchasing Fuelled Certified equipment:
  • Visually inspected and catalogued by Fuelled trained representatives
  • Immersive and credible data
  • Fuelled logistical support

Other Listings In This Package

C-093-H/094-B-1
View package

Related Listings