Listing Details
Category | RefrigerationPlant |
---|---|
Listing ID | 10200 |
Status | Sold |
Certification | Fuelled Certified |
Year | 2011 |
Make/Manufacturer | Startec |
Service | Unknown |
Condition | Used |
Fuelled Condition Rating | Condition A New/Unused Equipment Condition B Ready to go into operation with minor service (tune-up). Used but has been overhauled. Condition C Requires Overhaul but components are present and not damaged/used beyond repair. Condition D Requires Overhaul and major components (vessels, engine, instrumentation, piping, panel, etc.) are missing or damaged beyond repair. Condition E Scrap or suitable for parts. Major item(s) missing (I.e. Separator Package missing separator vessel or Compressor Package missing driver). |
Compressor Details | |
Compressor Type | Unknown |
Vessel Details | |
Vessel Orientation | Unknown |
Driver Details | |
Driver Type | Unknown |
Driver Fuel Type | Unknown |
Notes | |
Description: Asking Price for all three components (Refridge, Refridge compressor and Power Plant): $1,200,000 Unit has very few hours on it but has been stored outdoors and in the elements. 5 mmscfd Trailer Mounted Dewpoint Plant 250 HP Marathon/ Howden XRV 204/193 The package consists of two trailered units being a propane refrigeration plant and a gas process unit with interconnecting hose and facilities for quick connection of the required utilities. The process simulation for the recovery process covered a range of propane compositions from 90% down to 10% and the equipment has been provided to meet the worst case sizing requirement for the 4.0 mmscfd design flow.
| |
Certified Report
Location | |
Yard | Yard stored in Floresville Texas |
---|---|
Status | |
Equipment Still in Operation | No |
When was equipment last run | Aug 13, 2015 This is approx. |
Does the skid have skirting that needs to be removed | No |
Equipment still connected to piping | No |
Equipment still welded down to piles | No |
Equipment on a gravel pad | No |
Electrical still connected to the equipment | No |
Have vessels been cleaned out | Yes to be confirmed |
Shiploose items | Yes Possibly. to be confirmed |
Service | |
Hours since last major service? If so, how many? | Hours We were told that unit has approx. 50hrs of testing time. |
Has equipment been preserved? If so, when? | No |
Site Logistics | |
Equipment accessibility in yard or work site | |
Access into work site | |
Any road use agreement to access site | No |
Vessel Registrations | |
Provincial Vessel Registrations | AB, BC |
Equipment Appearance | |
Missing Parts | |
Corrosion | |
Animal Infestation | |
Overall cleanliness of package | |
Notes | |
Highly engineered package built by Startec. Levelers on trailer are either damaged or not properly deployed so trailer is leaning. |